The bay door 'open & close' mechanism painted and ready to mount on the inside wall:

I scratch built a drainage pipe that will be mount between both, the brick and concrete bay walls:


I have added side roof strips to all sides of the front facing building and painted them blue:

I scratch built a canopy for the second docking bay. I thought it was necessary and adds interest to the rest of the scene.



I used cardboard corrugated roofing which made the job easy and simple. This was later glued onto the styrene piece that was the canopy.


I used my trusty nuts and bolts for the areas that were going to be mounted to the wall. As you can also see, I made some bracing as well.:





The canopy mounted in place. I think it looks ok.


I decided to redo the concrete tarmac. I knew the ground did not look right, and this I was told should be perpendicular to the building and not at an angle as it is now. So I am trying to see if I can rectify my mistake by hiding those grooves. We'll see if it works.
